Skip to content

Huisman Concepts

A Design and Construction Company
  • Home
  • Blog
  • Contact Us

June 27, 2009 johnhuisman

We are getting the staining of the outside of the building done now. The above photo shows the screen porch…

Continue Reading →

Posted in: Uncategorized

June 11, 2009 johnhuisman

…working on the elevator shaft in our current project. This is a quick shot looking up from the main level.…

Continue Reading →

Posted in: Uncategorized

June 7, 2009 johnhuisman

A couple weeks ago, I had the opportunity to set up a pool table for one of my clients. This…

Continue Reading →

Posted in: Uncategorized

June 6, 2009 johnhuisman

Another cold morning. 32 degrees when I got up at 5:00. There was frost on the roofs. It is very…

Continue Reading →

Posted in: Uncategorized

June 4, 2009 johnhuisman

…continuing work on the interior railing. Here is a close-up shot of the railing going up the stairs with the…

Continue Reading →

Posted in: Uncategorized

June 1, 2009 johnhuisman

Inside we are working on the hand railing that goes around the loft area and stairways. The first step is…

Continue Reading →

Posted in: Uncategorized

May 28, 2009 johnhuisman

Working on getting the entry roof of this building completed. This is the project we have been working on most…

Continue Reading →

Posted in: Uncategorized

May 21, 2009 johnhuisman

I finally got this door installed in its permanent place. It is the finishing touch for this magnificent house we…

Continue Reading →

Posted in: Uncategorized

February 12, 2009 johnhuisman

Finally finished…

Continue Reading →

Posted in: Uncategorized

January 10, 2009 johnhuisman

I finished carving both side lite panels now and one of the main doors panels. They do not have a…

Continue Reading →

Posted in: Uncategorized

Post navigation

Page 25 of 26
← Previous 1 … 24 25 26 Next →
  • Blog
  • Contact Us
  • john-huisman.com
  • Home
  • Blog
  • Contact Us
Copyright © 2025 Huisman Concepts — Primer WordPress theme by GoDaddy