In December the roof trusses went up. T
he lake was not yet frozen, (it was by far the latest I have seen it freeze over), but we were starting to get some snow and wintry weather.
Here are the two parts of the building with the second floors built:
A few days of crane time were required to put this puzzle of a truss system together.